Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Moving the plane to a NEW Workshop - With much improved facilities.

;-)

     From THIS!    
     To THIS!    

Workshop Toilet
facilities...Really!

Complete with
adjacent wild
turkey flock!

Back Half Primed /UV'd & sanded.

Used Polyfiber water based urethanes.
"On the road again......"

Moving to the new workshop.

"On the road again...."

At the new workshop...

In the new Workshop.

Big enough to put on the wings...

Includes Heat & Good Lights.

WOW!

Thriple Tricycle Gear!  Nice!