Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


FUSELAGE & DOORS

Installing window to inside door skin.
Door skin pulled down with ropes and blocks.

Outer door skin glued to inner door skin.

Micro fillter @ door edges to get flush surface.
Couldn't get door completely flush with fuselage.

Door Latch Bracket

Doors hinged to fuselage.

Gas strut installed.

Two hinged doors that WORK.
(Doors are a pain to make!)

Measuring gap under door for seals.  Too bad
the gap isn't uniform!